{"id":203176,"date":"2021-11-12T13:56:19","date_gmt":"2021-11-12T12:56:19","guid":{"rendered":"https:\/\/polishscience.pl\/?p=203176"},"modified":"2021-11-23T13:56:52","modified_gmt":"2021-11-23T12:56:52","slug":"agh-university-of-science-and-technology-to-create-the-construction-of-the-student-construction-center","status":"publish","type":"post","link":"https:\/\/www.polishscience.pl\/en\/agh-university-of-science-and-technology-to-create-the-construction-of-the-student-construction-center\/","title":{"rendered":"AGH University of Science and Technology to create the construction of the Student Construction Center\u00a0"},"content":{"rendered":"<p><strong>The AGH University of Science and Technology in Krak\u00f3w and Mostostal Warszawa have signed a contract for the construction of the Student Construction Center (SCK).\u00a0The new facility will be a place for the implementation of innovative projects by students from the design phase to the construction of prototypes.\u00a0\u00a0<\/strong><\/p>\n<p>In the new building, students will develop existing projects such as solar boats and airplanes, rockets, rovers or autonomous vehicles and create new ones &#8211; informs Anna Zmuda-Muszy\u0144ska, the spokesperson of the University.<\/p>\n<p>The project involves a division into design and construction sections, which will be distributed on two floors of the building.\u00a0The usable area will be 1,322 m2.\u00a0The design section will be dedicated to research clubs from all over the university.\u00a0Students will be able to work on their substantive projects.<\/p>\n<p>The second section of a design nature will be equipped with the necessary instruments allowing for the implementation of projects in a creative form, i.e. with the use of lathes, milling machines, welding machines and printers.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The AGH University of Science and Technology in Krak\u00f3w and Mostostal Warszawa have signed a contract for the construction of the Student Construction Center (SCK).\u00a0The new facility will be a place for the implementation of innovative projects by students from the design phase to the construction of prototypes.\u00a0\u00a0 In the new building, students will develop [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[24,26],"tags":[],"_links":{"self":[{"href":"https:\/\/www.polishscience.pl\/en\/wp-json\/wp\/v2\/posts\/203176"}],"collection":[{"href":"https:\/\/www.polishscience.pl\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.polishscience.pl\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.polishscience.pl\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.polishscience.pl\/en\/wp-json\/wp\/v2\/comments?post=203176"}],"version-history":[{"count":0,"href":"https:\/\/www.polishscience.pl\/en\/wp-json\/wp\/v2\/posts\/203176\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.polishscience.pl\/en\/wp-json\/wp\/v2\/media?parent=203176"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.polishscience.pl\/en\/wp-json\/wp\/v2\/categories?post=203176"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.polishscience.pl\/en\/wp-json\/wp\/v2\/tags?post=203176"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}